Post by rich361 on Mar 16, 2012 6:39:36 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:40:25 GMT
Got my drum and cut it down today. Needs to have a good scrub and water blast before I use it. I'll get Dad to weld the top on to the drum, with my welding skills, I'd blow holes in it! 400mm high... Door height will be 248mm (62%) Sounds low?? Might put the drum on a extra row of bricks to make the top of the oven higher and then I'll be able to have a higher door. Thanks for the advice Marcus, I'll be thinkng Scones and Cupcakes when I'm mixing my Vermicrete!!
|
|
|
Post by rich361 on Mar 16, 2012 6:40:51 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:41:15 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:41:46 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:42:19 GMT
Vermiculite concrete done... Going to pour a concrete perimeter of the slab to keep it all together. Did some reaserch in the crumbly clay panels that came out of the heaters. Turns out they are called "Microtherm Panels" I looked them up on their website and they are high temp insulation panels. I place two layers of them under the Vermiculite concrete for extra insulation.
|
|
|
Post by rich361 on Mar 16, 2012 6:42:45 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:43:17 GMT
Thanks Rivergirl... Always try to be a little bit different!
Yeah, It is a long way to come for a pizza! :lol:
I think I'm still on target for my New Years deadline... Finish work mid next week (xmas break) so have a good few days to work on it!!
I'm doing an alternative cheaper option as I want to be sure our family will use the oven, I didn't what to spend heaps and then find it sits unused.
With all the recycled bits and pieces I have used and found makes the oven relatively cheap, Even with the huge cost of Fireclay and Vermiculite here in NZ...
One niggling issue that has been in the back of my mind though... I hope that timber frame is strong enough to take the weight of the oven!! The bricks that come out of the Night Store Heaters are very heavy!
I was going to lay double layers for fire bricks on the hearth, but with the weight issue, I may leave it at one layer.
I'm going to build additional support under the concrete slab to ease my mind before I lay any Firebricks.
|
|
|
Post by rich361 on Mar 16, 2012 6:43:44 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:44:14 GMT
Ring beam poured around outside of Vermiculite Concrete Base almost finished. Needs to be strengthened a wee bit before I build Oven.
|
|
|
Post by rich361 on Mar 16, 2012 6:45:17 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:45:42 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:46:09 GMT
Thanks Marcus and Tony. Marcus... I was having doubts about my timber base being strong enough so I got hold of another few fence posts and added extra support to all the beams. There is heaps of support for the slab now Tony... I was going to use double layer of hearth bricks because the bricks I am using are only 40mm thick. These night storge heater bricks seem to be twice as dense as normal bricks. So hopefully they should be OK. I currently trying to clean out my drum ready for the oven build. Last day of work for the year today so hopefully will have a couple of full days working on the oven!! Merry Xmas Everyone!
|
|
|
Post by rich361 on Mar 16, 2012 6:46:50 GMT
|
|
|
Post by rich361 on Mar 16, 2012 6:47:18 GMT
Hey Marcus,
Yes I will probably do what you have done... Just to get a bit of extra height for the door. Just have to double check my ratio still works??
Just had another look through your photos and noticed you had 4 bricks wide on you hearth, I way have to change that as it's a bit tight with drum and upper bricks.
Next problem is how to split these bricks, When the oven is finished, you won't be able to see the bricks so may have a go with a Bolster chisel? As long as they are roughly in half?? :roll:
|
|