|
Post by devokewater on May 28, 2018 8:39:51 GMT
I added my recent posts using my phone and didn't seem to be able to add images using that method.
So here is a catch up.
The dome is completed and today I need to check what needs pointing (as the polystyrene and sand support prevented that), and complete that. Then the front arch and chimney support need doing. I've left them until now as I thought I would need all the space I could to get to get my hands inside to point the ceiling.
|
|
gez
valid member
Posts: 32
|
Post by gez on May 28, 2018 9:32:36 GMT
Well done, itβs a great feeling finishing the dome π
|
|
|
Post by devokewater on May 28, 2018 12:36:33 GMT
Well done, itβs a great feeling finishing the dome π Thanks Gez, it is. What a bloody difficult job cleaning and pointing the roof is though. Getting there slowly.
|
|